- €990.05 economy
1,190g - 45 mm profile - CeramicSpeed bearings.
The Meilenstein ART in their Schwarz ED version are the latest evolution of the legendary Lightweight road wheel, the result of four years of intensive development. A true revolution in carbon engineering, they introduce the patented Alpha Rib Technology (ART): an internal ribbed structure that enhances lateral stiffness whilst reducing weight through a foam-free moulding process using reusable material.
The new rims, wider (22.9 mm internal width) and rounded, optimised via CFD and tested in a wind tunnel, significantly improve stability in crosswinds. Each wheel incorporates over 500 metres of carbon fibre and 70 preforms cut to size for an ultra-precise layup. The carbon spokes are bonded directly into the internal structure for maximum tension and increased durability.
The wheels are fitted with the new Penta-Fly, which incorporates the DT Swiss 180 EXP hub with CeramicSpeed bearings. The Meilenstein ART also features an exclusive measurement system called the Aero Mass Index (AMI = drag at 45 km/h × weight). As a result, they deliver 20% better aerodynamic performance than the Meilenstein EVO and outperform nine competing wheelsets tested.
Designed for the most demanding cyclists, the Meilenstein ART combines stiffness, lightness and aerodynamics in a format optimised for tyres of 28 mm and above.
- Rim height: 45 mm
- Internal rim width: 22.9 mm
- External rim width: 28.6 mm
- Diameter: 700C
- Tyre type: Tubeless Ready / Tubular (optimised for 28 mm)
- Spoke technology: Directly bonded, profiled carbon fibre spokes
- Freewheel body: Shimano / SRAM XDR / Campagnolo
Hubs:
- Penta-Fly: Ultra-lightweight machined aluminium hub - CeramicSpeed bearings
- Freehub compatibility: Shimano, SRAM XDR, Campagnolo.
- Braking system: Centerlock disc only
- Ratchet system
- Axles:
- Front: 12x100 mm
- Rear: 12x142 mm
Spokes:
- Number: 20 spokes at the front / 20 spokes at the rear.
- Material: Solid carbon fibre
- Technology: Spokes bonded directly into the reinforced internal structure (Alpha Rib), with no bends or points of deformation
Recommendations for use:
- Warranty: 5 years (with product registration)
- Maximum authorised system weight: 120 kg (cyclist + bike + equipment)
- Recommended pressure: Follow the instructions for the fitted tyres (optimal compatibility with tyres 28 mm and wider).
- Tyre fitment: Tubeless ready or inner-tube tyres. Tubeless fitment recommended to fully benefit from the lightness and comfort.
- Maintenance:
- Clean the rims with a soft, damp cloth, without using harsh solvents.
- Regularly check the condition of the bearings and the freehub body.
- In the event of a major impact, contact Lightweight technical support (carbon structure cannot be repaired using conventional methods).
- Transport: Always use the protective covers provided to prevent micro-cracks during transport.
- Maximum system weight: 120 kg (cyclist + bike + equipment).
Supplied with tubeless valves, tyre lever, transport covers.
Our team suggests
You may also like
Other products
To discover